905-431-3061
1-844-200-POWER (7693)
Sales, Service and Installation - Generac Authorized Dealer
Trust a Generator Dealer Professional
First Power Generators will do it Right the First Time
The Gas Company shut off the natural gas to this generator.  It was installed to close to windows and air intakes.  Carbon Monoxide was getting into the house and caused a dangerous living conditions.  This house owner paid an extra $3,000 to move and re-install this generator AFTER paying an Electrician to install it the first time the wrong way.  NOT A FIRST POWER JOB
Toronto House

The Gas Company shut off the natural gas to this generator since the gas lines and power cables were to close to a leaking second story eves and near furnace exhaust that added moisture to the air and froze on the gas pipe.   Luckily, it only cost this homeowner approx. $1,000 to fix. NOT A FIRST POWER JOB
Aurora House

A picture is worth a thousand BAD words.  Just a BAD idea from the start. No quality or professionalism at this Electricians' job site.  I think an Apprentice did this job.  

NOT A FIRST POWER JOB
Below Photos ARE NOT First Power Jobs
Don't Let This Happen to Your House
Markham House

A picture is worth a thousand BAD words.  Just a BAD job by this Electrician.   Looks TERRIBLE.  Too close to exhaust vents and A/C also.  Could the gas line gone closer to the ground to hide it?  The gas line looks ugly. Steel is 15 times stronger than the yellow flexible gas line.  This customer regrets hiring this Electrician but there is NOTHING they can do now except to hire a Dealer to fix it.  Too BAD!!!  We feel bad for the older couple who were taken advantage of.  Short cuts were taken with this one day install.  A quality job can't be done in 1 visit. Not Possible!!!  Enbridge turned the gas back on to the house after we talked with them about the repair plan.

  NOT A FIRST POWER JOB
Photo Above
Sharon House

JUST UGLY!!!!

NOT A FIRST POWER JOB
Above
Scarborough House

Not a code violation just a bad job.  The cables could have been placed much closer to the ground.  I guess this Installer didn't want to bend down to dirll and fasten the cables lower.

NOT A FIRST POWER JOB
Means
First Power Generators will do it Right the First Time